• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
BUCKET CUTTING EDGE REMOVAL
CHAPTER 4. DIRECT SUPPORT MAINTENANCE INSTRUCTIONS

Manual 2 Loader, Light, Scoop: 2.5 Cubic Yard Multipurpose (Mp) Clamshell Bucket, Diesel Engine Driven (Ded), 4-Wheel Drive Model 924G
Page Navigation
  724    725    726    727    728  729  730    731    732    733    734  
img
. .
TM 5-3805-290-23-2
BUCKET MAINTENANCE - CONTINUED
0144 00
BOWL/BULLDOZER REMOVAL
N OT E
Bowl weighs 842 lb (382 kg).
Bulldozer weighs 1,347 lb (611 kg).
1.
Remove cylinders. Refer to Cylinder Removal (WP 0139 00).
2.
Remove two cotter pins (13) from pins (14).
3.
Remove two pins (14) and bearings (15) from bowl (16) and bulldozer (17).
4.
With assistance, use lifting equipment to remove bulldozer (17) from bowl (16).
427-B1325
BOWL/BULLDOZER INSTALLATION
1.
With assistance, use lifting equipment to install bulldozer (17) on bowl (16).
2.
Install two bearings (15) and pins (14) in bulldozer (17) and bowl (16).
3.
Install two cotter pins (13) in pins (14).
4.
Install cylinders. Refer to Cylinder Installation (WP 0139 00).
5.
Verify bowl operation (TM 5-3805-290-10).
END OF WORK PACKAGE
0144 00-6


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.