• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
CYLINDER HEAD REPLACEMENT - CONTINUED
CYLINDER HEAD REPLACEMENT - CONTINUED

Manual 2 Loader, Light, Scoop: 2.5 Cubic Yard Multipurpose (Mp) Clamshell Bucket, Diesel Engine Driven (Ded), 4-Wheel Drive Model 924G
Page Navigation
  772    773    774    775    776  777  778    779    780    781    782  
img
TM 5-3805-290-23-2
CYLINDER HEAD REPLACEMENT - CONTINUED
0146 00
INSTALLATION - CONTINUED
N OT E
Lubricate cylinder head bolts with clean
engine oil before installation.
8.
Install 32 new bolts (6) in cylinder head (7).
427-B0646
427-B0357
9.
Tighten bolts 1 thru 32 in numerical order (as shown) to torque of 80 lb-ft (108 Nm).
10.
Tighten bolts 1 thru 32 again in numerical order (as shown) to torque of 80 lb-ft (108 Nm).
11.
Place an index mark on each bolt (6).
a.
Turn bolts that are marked with an "S" an additional 150 degrees (2.5 flats).
b.
Turn bolts that are marked with an "M" an additional 180 degrees (3.0 flats).
c.
Turn bolts that are marked with an "L" an additional 210 degrees (3.5 flats).
427-B0356
0146 00-9


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.