• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
PISTON COOLING JETS REPLACEMENT - CONTINUED
OIL PUMP REPLACEMENT

Manual 2 Loader, Light, Scoop: 2.5 Cubic Yard Multipurpose (Mp) Clamshell Bucket, Diesel Engine Driven (Ded), 4-Wheel Drive Model 924G
Page Navigation
  829    830    831    832    833  834  835    836    837    838    839  
img
. .
TM 5-3805-290-23-2
PISTON COOLING JETS REPLACEMENT - CONTINUED
0159 00
INSTALLATION - CONTINUED
N OT E
Rotate crankshaft to verify alignment of piston cooling jet and piston head.
6.
Tighten banjo bolt (1) of valve assembly (2) to 15 lb-ft
(20 Nm).
427-B0596-1
7.
Repeat steps 1 thru 5 for installation of remaining piston cooling jets.
8.
Install engine oil pan (WP 0157 00).
9.
Fill oil to correct level (WP 0025 00).
10.
Run engine until normal operating temperature is reached (TM 5-3805-290-10).
11.
Shut down engine (TM 5-3805-290-10).
12.
Check for leaks.
END OF WORK PACKAGE
0159 00-4


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.