• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
SEPARATE LOADER FRAME AND REAR FRAME (ARTICULATION PIVOT PINS) REPLACEMENT
SEPARATE LOADER FRAME AND REAR FRAME (ARTICULATION PIVOT PINS) REPLACEMENT - CONTINUED

Manual 2 Loader, Light, Scoop: 2.5 Cubic Yard Multipurpose (Mp) Clamshell Bucket, Diesel Engine Driven (Ded), 4-Wheel Drive Model 924G
Page Navigation
  1005    1006    1007    1008    1009  1010  1011    1012    1013    1014    1015  
img
.
TM 5-3805-290-23-2
SEPARATE LOADER FRAME AND REAR FRAME
(ARTICULATION PIVOT PINS REPLACEMENT) - CONTINUED
0183 00
SEPARATION
WARN I N G
To prevent injury to personnel, wear protective eye covering and gloves.
C AU T I O N
Wipe area clean around all connections to be opened during removal. Cap lines and hoses and plug
openings after removing lines. Contamination of system could result in premature failure.
N OT E
Tag hoses to ensure correct installation.
Use a container to catch any hydraulic oil that may drain from hoses or system. Dispose of fluid IAW
local policy and ordinances. Ensure all spills are cleaned up.
1.
Remove four bolts (1) and washers (2) from guard
assembly (3).
2.
Remove guard assembly (3) from machine.
427-B0431
0183 00-2


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.