• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Wastegate Inspection
TURBOCHARGER ASSEMBLY, AIR LINES, AND OIL LINES REPLACEMENT - CONTINUED

Field Maintenance Manual 1 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  1214    1215    1216    1217    1218  1219  1220    1221    1222    1223    1224  
img
TM 5-3805-291-23-1
TURBOCHARGER ASSEMBLY, AIR LINES, AND OIL LINES REPLACEMENT - CONTINUED
0032 00
INSTALLATION
WARN I N G
Use extreme caution when handling heavy parts. Provide adequate support and use assistance during pro-
cedure. Ensure that any lifting equipment used is in good condition and of suitable load capacity. Keep
clear of heavy parts supported only by lifting equipment. Failure to follow this warning may result in injury
or death to personnel.
N OT E
Turbocharger weighs 75 lb (34 kg).
1.
Attach lifting equipment to turbocharger (5).
2.
With assistance, position new gasket (17) and turbocharger (5) on machine and install four nuts (16) on turbocharger.
Tighten nuts to 52 11 lb-ft (70 15 Nm).
3.
Lubricate and install new O-ring (20), two washers (19), bolts (18), and tube (13) on machine.
4.
Install new gasket (12), two washers (11), and bolts (10) on tube (13) and connect tube to turbocharger (5).
5.
Install new gasket (9), two washers (7), and bolts (6) on turbocharger (5) and connect line (8) to turbocharger.
6.
Lubricate and install two new O-rings (23) in fitting (21) and line (8). Install fitting and line on machine.
427-C0446
427-C0445
0032 00-8


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.