• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
TURBOCHARGER ASSEMBLY, AIR LINES, AND OIL LINES REPLACEMENT - CONTINUED
FUEL TANK REPLACEMENT - CONTINUED

Field Maintenance Manual 1 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  1216    1217    1218    1219    1220  1221  1222    1223    1224    1225    1226  
img
. . . . . . . . . . . . . .
6
TM 5-3805-291-23-1
FUEL TANK REPLACEMENT
0033 00
THIS WORK PACKAGE COVERS
Draining, Removal, Cleaning and Inspection, Installation
INITIAL SETUP
Personnel Required
Maintenance Level
Unit
MOS 62B, Construction Equipment Repairer (2)
Tools and Special Tools
Equipment Conditions
Tool kit, general mechanic's, automotive (Item 90,
Machine parked on level ground (TM 5-3805-291-
WP 0232 00)
10)
Shop equipment, automotive maintenance and
Work tool lowered to ground (TM 5-3805-291-10)
repair: organizational maintenance, common no.
1 (Item 70, WP 0232 00)
Parking brake engaged (TM 5-3805-291-10)
Materials/Parts
Wheels chocked
Cap set, protective (Item 6, WP 0233 00)
Battery disconnect switch in OFF position (TM 5-
Cleaning compound, solvent, type III (Item 7, WP
3805-291-10)
0233 00)
Steering frame lock connected (TM 5-3805-291-
Detergent, general purpose, liquid (Item 9, WP
10)
0233 00)
Hood opened (TM 5-3805-291-10)
Diesel fuel, DF-1 (Item 10, WP 0233 00)
Fuel oil, diesel, DF-2 (Item 11, WP 0233 00)
Drawings Required
Fuel, turbine, aviation (Item 12, WP 0233 00)
TM 5-3805-291-23P, Figures 34 and 63
Rag, wiping (Item 35, WP 0233 00)
Estimated Time to Complete Task
Tag, marker (Item 43, WP 0233 00)
4.0 hr
O-ring (2)
0033 00-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.