• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
MUFFLER AND EXHAUST PIPE REPLACEMENT - CONTINUED
MUFFLER AND EXHAUST PIPE REPLACEMENT - CONTINUED

Field Maintenance Manual 1 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  1258    1259    1260    1261    1262  1263  1264    1265    1266    1267    1268  
img
TM 5-3805-291-23-1
MUFFLER AND EXHAUST PIPE REPLACEMENT - CONTINUED
0040 00
INSTALLATION
WARN I N G
Use extreme caution when handling heavy parts. Provide adequate support and use assistance during pro-
cedure. Ensure that any lifting equipment used is in good condition and of suitable load capacity. Keep
clear of heavy parts supported only by lifting equipment. Failure to follow this warning may result in injury
or death to personnel.
N OT E
Muffler weighs 126 lb (57 kg).
1.
With assistance, attach lifting equipment to muffler
(1) and position muffler on machine.
427-C0202
2.
Install two nuts (7), spacers (6), bolts (4), and four
washers (5) on muffler (1).
3.
Repeat step 2 for other side.
4.
Connect tube assembly (3) to muffler (1) and tighten
clamp (2) to 35 lb-ft (47 Nm).
427-C0201
0040 00-4


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.