• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
FUSE, RELAY, CIRCUIT BREAKER, AND ARC SUPPRESSOR REPLACEMENT - CONTINUED
CAB CIRCUIT BREAKER REMOVAL

Field Maintenance Manual 2 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  35    36    37    38    39  40  41    42    43    44    45  
img
TM 5-3805-291-23-2
FUSE, RELAY, CIRCUIT BREAKER, AND ARC SUPPRESSOR REPLACEMENT - CONTINUED
0053 00
HOOD TILT RELAY REMOVAL - CONTINUED
2.
Disconnect wiring harness (8) from wiring harness (9).
3.
Remove four bolts (10) and washers (11) from relay (12).
4.
Remove relay (12) from panel.
HOOD TILT RELAY INSTALLATION
1.
Position relay (12) on panel.
2.
Install four washers (11) and bolts (10) on relay (12).
3.
Connect wiring harness (9) to wiring harness (8)
4.
Install panel (7), three washers (6), and bolts (5) on machine.
0053 00-6


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.