• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ARC SUPPRESSOR
INSTRUMENT CLUSTER REPLACEMENT - CONTINUED

Field Maintenance Manual 2 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  39    40    41    42    43  44  45    46    47    48    49  
img
. . . . . .
2
TM 5-3805-291-23-2
INSTRUMENT CLUSTER REPLACEMENT
0054 00
THIS WORK PACKAGE COVERS
Removal, Installation
INITIAL SETUP
Equipment Conditions
Maintenance Level
Unit
Machine parked on level ground (TM 5-3805-291-
10)
Tools and Special Tools
Work tool lowered to ground (TM 5-3805-291-10)
Tool kit, general mechanic's, automotive (Item 90,
WP 0232 00)
Parking brake engaged (TM 5-3805-291-10)
Shop equipment, automotive maintenance and
Wheels chocked
repair: organizational maintenance, common no.
Battery disconnect switch in OFF position (TM 5-
1 (Item 70, WP 0232 00)
3805-291-10)
Materials/Parts
Drawings Required
Rag, wiping (Item 35, WP 0233 00)
TM 5-3805-291-23P, Figure 50
Tag, marker (Item 43, WP 0233 00)
Estimated Time to Complete Task
Personnel Required
0.2 hr
MOS 62B, Construction Equipment Repairer
WARN I N G
Ensure battery disconnect switch is in OFF position before performing this task. Failure to follow this
warning may result in injury to personnel or damage to equipment.
0054 00-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.