TM 5-3805-291-23-2
MAIN CONTROL VALVE AND IMPLEMENT PUMP HYDRAULIC
HOSES, LINES, AND FITTINGS REPLACEMENT - CONTINUED
0157 00
INSTALLATION - CONTINUED
14.
Position valve (45) on machine and install two
washers (48) and bolts (47).
15.
Install two new O-rings (46) in fittings (41 and 43)
and install fittings on valve (45).
16.
Install new O-ring (44) in hose (37) and connect hose
(37) to fitting (43).
17.
Install new O-ring (42) in hose (33) and connect hose
to fitting (41).
427-C1299
18.
Install new O-ring (40) in hose (39) and connect hose
to main hydraulic control valve (2).
19.
Install new O-ring (38) in hose (37) and connect hose
to main hydraulic control valve (2).
427-C1298
20.
21.
Install new O-ring (35) in hose (33) and connect hose
to fitting (34).
22.
Install new O-ring (31) in hose (32) and position hose
on main hydraulic control valve (2). Install four wash-
ers (30) and bolts (29).
23.
Install new gasket (27) on hose (28) and position hose
on main hydraulic control valve (2). Install four wash-
ers (26) and bolts (25).
427-C1297
0157 00-10