• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ENGINE REPLACEMENT - CONTINUED
CYLINDER HEAD REPLACEMENT

Field Maintenance Manual 2 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  783    784    785    786    787  788  789    790    791    792    793  
img
. . . . .
TM 5-3805-291-23-2
ENGINE REPLACEMENT - CONTINUED
0171 00
INSTALLATION - CONTINUED
48.
Place cover (7) on machine.
49.
Position cold start injector line (8) on cover (7) and
install two clips (6), six washers (5), and three bolts
(4) on cover.
50.
Install accumulator and dryer assembly (3), three
washers (2), and bolts (1).
427-C0480
51.
Install AC dryer (WP 0224 00).
52.
Install belt tensioner (WP 0047 00).
53.
Install serpentine belt (WP 0048 00).
54.
Connect battery cables to starter (WP 0051 00).
55.
Fill engine oil (TM 5-3805-291-10).
56.
Install cooling system package (WP 0190 00).
57.
Install oil fill tube (WP 0029 00).
58.
Install side covers (WP 0135 00).
59.
Install air cleaner (WP 0030 00).
60.
Install air intake hoses and lines (WP 0034 00).
61.
Fill transmission fluid to correct level (TM 5-3805-291-10).
62.
Fill hydraulic fluid to correct level (WP 0100 00).
63.
Run engine until normal operating temperature is reached (TM 5-3805-291-10).
64.
Shut down engine (TM 5-3805-291-10).
65.
Check for leaks.
END OF WORK PACKAGE
0171 00-37/(0171 00-38 Blank)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.