• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
SECONDARY STEERING WIRING HARNESS REPLACEMENT - CONTINUED
TRANSMISSION CONTROL WIRING HARNESS REPLACEMENT

Field Maintenance Manual 2 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  986    987    988    989    990  991  992    993    994    995    996  
img
.
TM 5-3805-291-23-2
SECONDARY STEERING WIRING HARNESS REPLACEMENT - CONTINUED
0200 00
INSTALLATION - CONTINUED
12.
Connect battery cables to battery (WP 0096 00).
13.
Start machine (TM 5-3805-291-10).
14.
Run engine until operating temperature is reached and verify correct operation of machine (TM 5-3805-291-10).
15.
Shut down engine (TM 5-3805-291-10).
END OF WORK PACKAGE
0200 00-4


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.