TM 5-3805-291-23-2
SEPARATE FRONT LOADER FRAME AND REAR FRAME
THIS WORK PACKAGE COVERS
Separation, Connection
INITIAL SETUP
Maintenance Level
Materials/Parts
Direct Support
Tools and Special Tools
Oil, lubricating, OE/HDO-5/40 (Item 27, WP 0233
Tool kit, general mechanic's, automotive (Item 90,
00)
Oil, lubricating, OE/HDO-15/40 (Item 28, WP
Shop equipment, machine shop, field maintenance,
Bearing (4)
Bearing cup (4)
Bearing sleeve (2)
Lip seal (4)
Personnel Required
MOS 62B, Construction Equipment Repairer (2)
References
Pump, hydraulic ram, hand driven (Item 57, WP
TM 5-3805-291-10
WP 0016 00
Remover, bearing and bushing (Item 61, WP 0232
Equipment Conditions
00)
Front wiring harness disconnected from chassis
Hydraulic hose assemblies disconnected from front
Wrench, torque, click, ratcheting, 1/2" drive, 250
Drawings Required
Bottle jack
TM 5-3805-291-23P, Figure 117
Lifting equipment, 75,000-lb capacity
Estimated Time to Complete Task
Wood block 12 x 12 x 24-in. (2)
14.0 hr