TM 5-3805-292-10
0020
Table 1. Preventive Maintenance Checks and Services (PMCS)
for the M400T and M400W SSL - Continued.
LOCATION
ITEM TO
CHECK/
ITEM
MAN-
NOT READY/
SERVICE
NO.
INTERVAL
HOURS
PROCEDURE
AVAILABLE IF:
62
After
ROPS/FOPS
a. Inspect worklights at top side of Damage to lights.
Cab and
ROPS/FOPS cab for damage
Worklights
and cleanliness. If dirty, clean
worklights with a rag and
windshield cleaning compound.
b. Inspect right-side window for
breaks or other damage.
63
M400T: Track
Initial 10
Tension
Hours
NOTE
If machine is new or tracks are new, track tension should be checked after initial 10 hours of operation.
Check track tension and adjust as
64
Initial 10
M400W: Right- a. Check for loose or missing axle Any axle mounting
mounting hardware. Notify Field hardware is missing.
Hours
Side Axles,
Chain Tank,
Maintenance if any are loose or
Wheels and
missing.
Tires
b. Check chain tank for oil leaks.
Class III oil leaks are
evident.
CHAIN TANK
AXLE MOUNTING
BOLTS
458-0013
Figure 48. Axle Mounting Bolts and Chain Tank (M400W).
0020
NOTE
If machine is new or a new wheel and tire assembly has just been installed, wheel lug nuts should be
checked by Field Maintenance every 10 hours until nuts remain at torque. Torque is 100 to 120 lb-ft (135 to
163 Nm).
c. Check for loose or missing
Two or more lug nuts are
missing.
wheel lug nuts.
0020-54