TM 5-3805-292-23
0106
REMOVAL CONTINUED
7. Remove nut (Figure 5, Item 4), bolt (Figure 5, Item 2), and pin (Figure 5, Item 3) from loader arm (Figure 5,
Item 1).
8. Repeat step 7 to remove second pin.
9. Remove loader arm (Figure 5, Item 1) from machine and place on a flat surface.
10. Remove lifting device from loader arm (Figure 5, Item 1).
Figure 5. Loader Arm.
0106
END OF TASK
DISASSEMBLY
000106
N OT E
Tag and cap hydraulic lines and hoses to aid in installation.
1. Remove four hoses (Figure 6, Item 1) and two O-rings (Figure 6, Item 3) from two tilt cylinders (Figure 6, Item
2). Discard O-rings.
2. Remove two fittings (Figure 6, Item 4) and O-rings (Figure 6, Item 5). Discard O-rings.