• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 1. Blower Switch Knob.
CAB WIRING HARNESS REPLACEMENT

Field Maintenance Manual For M400T And M400W
Page Navigation
  954    955    956    957    958  959  960    961    962    963    964  
img
. .
TM 5-3805-292-23
0144
INSTALLATION
000144
1. Connect connector (Figure 2, Item 3) to switch (Figure 2, Item 1).
2. Install switch (Figure 2, Item 1) and nut (Figure 2, Item 2) on post LH console (Figure 2, Item 3).
3. Install knob (Figure 1, Item 1) on post LH console (Figure 1, Item 2).
END OF TASK
FOLLOW-ON TASKS
000144
1. Install post LH console (WP 0094).
2. Connect battery power (WP 0142).
3. Verify correct operation of machine (TM 5-3805-292-10).
END OF TASK
END OF WORK PACKAGE
0144-3/(4 blank)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.