• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
BATTERY AND CHARGING SYSTEM TESTS, INSPECTIONS, AND ADJUSTMENTS
Figure 2. Ammeter Connection.

Field Maintenance Manual For 924H Wheel Loader -2 Page Navigation
  315    316    317    318    319  320  321    322    323    324    325  
img
.
TM 5-3805-298-23-2
0165
BATTERY CHARGING
000165
1. Connect positive (red) clip of battery charger to positive post on battery, and connect negative clip of battery
charger to chassis ground.
2. Turn battery charger switch ON.
3. Charge battery until the green Charge Complete LED is illuminated.
4. Charge will terminate when charge current drops below one ampere.
5. When charge is complete, test battery. Refer to Battery Tests in this work package.
END OF TASK
CHARGING SYSTEM TEST
000165
1. Turn battery disconnect switch and ignition switch to ON position (TM 5-3805-298-10).
2. Turn headlights ON (TM 5-3805-298-10) for 10 minutes to provide a drain on batteries.
3. Set ammeter dial (Figure 1, Item 6) to 400 DC amp scale (Figure 1, Item 1).
4. Press ZERO button (Figure 1, Item 2) to zero the meter. Make sure that HOLD (Figure 1, Item 3) is not
displayed on screen (Figure 1, Item 4). If HOLD is displayed, press HOLD button (Figure 1, Item 5) once.
Figure 1. Ammeter.
0165
0165-2


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.