• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 37. Pilot Supply Pressure Connection.
Figure 39. Pilot Supply Pressure Connection.

Field Maintenance Manual For 924H Wheel Loader -2 Page Navigation
  360    361    362    363    364  365  366    367    368    369    370  
img
.
TM 5-3805-298-23-2
0166
PILOT SYSTEM PRESSURE TEST CONTINUED
14. Disconnect hose 177-7861 (Figure 38, Item 2) from pilot supply pressure connection (Figure 37, Item 2).
15. Install cap (Figure 37, Item 1) on pilot supply pressure connection (Figure 37, Item 2).
16. Install right lower cab access panels (WP 0347).
Figure 38. 1,450 psi (10,000 kPa) Gauge Assembly.
0166
END OF TASK
0166-43


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.