• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 27. Implement Control Valve.
Figure 29. Bracket and Tube Assembly.

Field Maintenance Manual For 924H Wheel Loader -2 Page Navigation
  532    533    534    535    536  537  538    539    540    541    542  
img
.
TM 5-3805-298-23-2
0177
REMOVAL CONTINUED
CAUTION
Cap all hydraulic openings along with component connections during removal to protect
against contamination. Failure to follow this caution may result in damage to equipment.
NOTE
Tag and mark all hoses and tubes to aid in installation.
Note routing of hoses and tubes for installation.
52. Loosen two tube nuts (Figure 28, Item 1) and remove tube (Figure 28, Item 4) from implement control valve
(Figure 28, Item 2).
53. Loosen tube nut (Figure 28, Item 3) from implement control valve (Figure 28, Item 2). Discard O-ring.
Figure 28. Implement Control Valve.
0177
0177-26


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.