• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 9. Implement Pump Bolts.
Figure 12. Implement Pump Manifold.

Field Maintenance Manual For 924H Wheel Loader -4 Page Navigation
  89    90    91    92    93  94  95    96    97    98    99  
img
.
TM 5-3805-298-23-4
0370
INSTALLATION CONTINUED
8. Install new O-ring (Figure 10, Item 3), hose (Figure 10, Item 4), split flanges (Figure 10, Item 6), four washers
(Figure 10, Item 2) and bolts (Figure 10, Item 1) on implement pump (Figure 10, Item 5).
Figure 10. Implement Pump Connections.
0370
9. Install hose (Figure 11, Item 10) and tighten clamp (Figure 11, Item 2) on tee fitting (Figure 11, Item 3).
10. Install new O-ring (Figure 11, Item 4), hose (Figure 11, Item 6) and tighten tube nut (Figure 11, Item 5) on tee
fitting (Figure 11, Item 3).
11. Install new O-ring (Figure 11, Item 8), hose (Figure 11, Item 1) and tighten tube nut (Figure 11, Item 9) on fitting
(Figure 11, Item 7).
Figure 11. Implement Pump Connections.
0370
0370-10


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.