Figure 10. Implement Pump Connections.
VALVE GP BANK 3 (MAIN CONTROL) REPLACEMENT

Field Maintenance Manual For 924H Wheel Loader -4 Page Navigation
  90    91    92    93    94  95  96    97    98    99    100  
img
.
TM 5-3805-298-23-4
0370
INSTALLATION CONTINUED
12. Install new O-ring (Figure 12, Item 1) on manifold assembly (Figure 12, Item 3).
13. Position manifold assembly (Figure 12, Item 3) on implement pump (Figure 12, Item 2).
14. Install four washers (Figure 12, Item 5), bolts (Figure 12, Item 4) and manifold assembly (Figure 12, Item 3) on
implement pump (Figure 12, Item 2).
Figure 12. Implement Pump Manifold.
0370
END OF TASK
FOLLOW-ON TASK
000370
1. Install steering and pilot pump (WP 0335).
2. Verify correct operation of machine (TM 5-3805-298-10).
END OF TASK
END OF WORK PACKAGE
0370-11/(12 blank)