• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
INSTALLATION
RIDE CONTROL VALVE AND SOLENOID REPLACEMENT

Field Maintenance Manual For 924H Wheel Loader -4 Page Navigation
  143    144    145    146    147  148  149    150    151    152    153  
img
. .
TM 5-3805-298-23-4
0375
INSTALLATION CONTINUED
8. Install plate (Figure 5, Item 1), six washers (Figure 5, Item 3), and bolts (Figure 5, Item 2) on operator console
(Figure 5, Item 4).
.
Figure 5. Pilot Valve Console Cover.
0375
END OF TASK
FOLLOW-ON TASKS
000375
1. Fill hydraulic tank (WP 0368).
2. Verify correct operation of machine (TM 5-3805-298-10).
END OF TASK
END OF WORK PACKAGE
0375-5/(6 blank)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.