• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 12. Left Batteries.
LEFT BATTERY BOX AND NATO SLAVE INSTALLATION

Field Maintenance Manual For 924H Wheel Loader -4 Page Navigation
  347    348    349    350    351  352  353    354    355    356    357  
img
.
TM 5-3805-298-23-4
0397
LEFT BATTERY BOX AND NATO SLAVE REMOVAL CONTINUED
WARNING
Use extreme caution when handling heavy parts. Provide adequate support and use
assistance during procedure. Ensure lifting device used is in good condition and of
suitable load capacity. Keep clear of heavy parts supported only by lifting device. Failure to
follow this warning may cause injury or death to personnel.
NOTE
Battery box weighs approximately 82 lb (37.19 kg).
Note position and location of bolts to aid installation.
19. Remove five bolts (Figure 13, Item 2), washers (Figure 13, Item 3), and battery box (Figure 13, Item 1) from
machine.
Figure 13. Left Battery Box.
0397
END OF TASK
CLEANING AND INSPECTION
000397
Clean and inspect all parts IAW Mechanical General Maintenance Instructions (WP 0172).
Clean and inspect all parts IAW Electrical General Maintenance Instructions (WP 0174).
END OF TASK
0397-14


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.