• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 9. Left Batteries.
Figure 12. NATO Slave Cables.

Field Maintenance Manual For 924H Wheel Loader -4 Page Navigation
  370    371    372    373    374  375  376    377    378    379    380  
img
.
TM 5-3805-298-23-4
0398
LEFT BATTERIES INSTALLATION CONTINUED
6. Install positive battery cable (Figure 10, Item 8), three cable clamps (Figure 10, Item 6), bolts
(Figure 10, Item 4) and nuts (Figure 10, Item 5) on three batteries (Figure 7, Item 7).
7. Install positive battery cable (Figure 10, Item 8), washer (Figure 10, Item 3), and nut (Figure 10, Item 2) on
cable clamp (Figure 10, Item 6).
8. Position three boots (Figure 10, Item 1) on three cable clamps (Figure 10, Item 6).
Figure 10. Left Positive Battery Cable.
0398
9. Install plate (Figure 11, Item 3), four washers (Figure 11, Item 2), and bolts (Figure 11, Item 1) on battery box
(Figure 11, Item 4).
Figure 11. Left Battery Box Plate.
0398
0398-11


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.