TM 5-2420-231-10
OPERATOR LEVEL
PREPARATION FOR SHIPMENT AND STORAGE
INITIAL SETUP:
Tools and Special Tools
Materials/Parts - Continued
None
Item 25)
Materials/Parts
Strap, tiedown, electrical components
Corrosion preventive compound (WP 0029, Item 6)
Corrosion preventive compound (WP 0029, Item 7)
Oil, lubricating, general purpose (WP 0029, Item 19)
Equipment Condition
NOTE
Unless otherwise stated, all preparation for shipment and storage must be performed with the
assistance of field maintenance.
0025-1