• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 28. Flowmeter Inlet Hose.
LARGE AND SMALL HYDRAULIC OIL PUMP EFFICIENCY TEST

Tractor, Wheeled, Industrial Backhoe Loader Nsn 2420-01-532-3399
Page Navigation
  1088    1089    1090    1091    1092  1093  1094    1095    1096    1097    1098  
img
.
TM 5-2420-231-23-1
0086
LARGE AND SMALL HYDRAULIC OIL PUMP EFFICIENCY TEST CONTINUED
8. Remove two screws (Figure 29, Item 3) and screen (Figure 29, Item 4) from hydraulic reservoir
(Figure 29, Item 5).
9. Insert outlet hose (Figure 29, Item 2) until it touches bottom of hydraulic reservoir (Figure 29, Item 5) and
secure hose in place.
Figure 29. Hydraulic Reservoir.
0086
10. Connect inlet hose (Figure 30, Item 1) and outlet hose (Figure 30, Item 2) to flowmeter (Figure 30, Item 3).
Figure 30. Flowmeter Connections.
0086
0086-26


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.