• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 29. Drain Cock.
Figure 31. Bracket Grommet.

Tractor, Wheeled, Industrial Backhoe Loader Nsn 2420-01-532-3399
Page Navigation
  79    80    81    82    83  84  85    86    87    88    89  
img
.
TM 5-2420-231-23-2
0092
ASSEMBLY CONTINUED
NOTE
The procedure for radiator fasteners removal and replacement is identical for left-hand
and right-hand fasteners. Left-hand radiator fasteners are shown in this procedure.
10. Position oil cooler (Figure 30, Item 4) on radiator (Figure 30, Item 1).
11. Install two washers (Figure 30, Item 3) and bolts (Figure 30, Item 2) on oil cooler (Figure 30, Item 4).
12. Repeat step 11 on right side.
Figure 30. Radiator Holddown.
0092
0092-24


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.