• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 3. Crankshaft Oil Seal Installation.
Figure 2. Front Cover Sealant.

Tractor, Wheeled, Industrial Backhoe Loader Nsn 2420-01-532-3399
Page Navigation
  177    178    179    180    181  182  183    184    185    186    187  
img
. . . .
4
TM 5-2420-231-23-2
0107
FIELD MAINTENANCE
-
TIMING COVER REPLACEMENT
01
07
Removal, Cleaning and Inspection, Installation
INITIAL SETUP
Tools and Special Tools
References
Tool Kit, General Mechanic's
WP 0369
0
0
(WP 0376, Item 117)
WP 0374 (Group Number 0112)
0
Wrench, Torque, 3/8" Dr., 10-100 ft-lb
0
Equipment Conditions
(WP 0376, Item 146)
Crankshaft front seal removed (WP 0106)
0
Materials/Parts
Oil pan removed (WP 0105)
0
Rag, Wiping (WP 0375, Item 25)
0
Estimated Time to Complete
Sealant, Silicone (WP 0375, Item 28)
0
17.3 hr
0
REMOVAL
0107
1. Loosen bolt (Figure 1, Item 3) and remove idler pulley (Figure 1, Item 2) from engine.
NOTE
Note position and length of bolts to aid in installation.
Cooling fan removed for clarity.
2. Remove eight bolts (Figure 1, Item 4), five bolts (Figure 1, Item 1), and front cover (Figure 1, Item 5) from
engine.
Figure 1. Front Cover.
0107
END OF TASK
0107-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.