TM 5-2420-231-23-2
0111
INSTALLATION CONTINUED
31. Connect A/C compressor connector (Figure 30, Item 2) to machine connector (Figure 30, Item 1).
32. Install tiedown straps (Figure 30, Item 3) on A/C compressor connector (Figure 30, Item 2) and wiring harness.
Figure 30. Compressor Connection.
0111
END OF TASK
FOLLOW-ON TASKS
0111
2. Install fan drive pulley and support hub (WP 0135).
4. Install drive belt tensioner and bracket (WP 0133).
5. Check A/C compressor V-belt tension (WP 0367).
END OF TASK
END OF WORK PACKAGE