TM 5-2420-231-23-2
0190
INSTALLATION CONTINUED
2. Position stabilizer control switches (Figure 4, Item 2) on machine.
3. Connect two wiring harness connectors (Figure 4, Item 1) to stabilizer control switches (Figure 4, Item 2).
Figure 4. Stabilizer Control Switches Connectors.
0190
4. Install stabilizer control switches (Figure 5, Item 3) on left backhoe control tower (Figure 5, Item 2).
5. Install switch guard (Figure 5, Item 1) and two bolts (Figure 5, Item 4) on left backhoe control tower
(Figure 5, Item 2).
Figure 5. Stabilizer Control Switches.
0190
END OF TASK