TM 5-2420-231-23-2
0196
INSTALLATION CONTINUED
NOTE
Install wires as tagged and marked during removal.
6. Push 12-V cable (Figure 7, Item 12) through grommet hole (Figure 7, Item 10).
7. Install ground cable (Figure 7, Item 9) on machine.
8. Connect three ground cables (Figure 7, Item 9) and install nut (Figure 7, Item 8) on stud (Figure 7, Item 7).
9. Install 24-V cable (Figure 7, Item 14) on machine.
10. Connect 24-V cable (Figure 7, Item 14), ground cable (Figure 7, Item 9) and two 12-V cables (Figure 7, Items
12 and 13), to equalizer (Figure 7, Item 4).
11. Connect four 24-V battery cables (Figure 7, Items 14, 15, 16, and 17) and install nut (Figure 7, Item 1) on junc-
tion block (Figure 7, Item 2).
12. Install three new lockwashers (Figure 7, Item 5) and nuts (Figure 7, Item 6) on equalizer (Figure 7, Item 4).
13. Position two rubber boots (Figure 7, Items 3 and 11) over terminals.
Figure 7. Equalizer.
0196