• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 17. Tube.
RETURN-TO-DIG SOLENOID REPLACEMENT

Tractor, Wheeled, Industrial Backhoe Loader Nsn 2420-01-532-3399
Page Navigation
  262    263    264    265    266  267  268    269    270    271    272  
img
. .
TM 5-2420-231-23-3
0261
INSTALLATION CONTINUED
23. Install plates (Figure 18, Item 1), four washers (Figure 18, Item 3), and bolts (Figure 18, Item 2) on machine.
Figure 18. Plates.
0261
24. Tighten nut (Figure 19, Item 1) and bolt (Figure 19, Item 3) on bracket (Figure 19, Item 2).
Figure 19. Bracket.
0261
25. Install cap on hydraulic tank (TM 5-2420-231-10).
END OF TASK
FOLLOW-ON TASKS
0261
1. Install front floor cover plate (WP 0306).
2. Install instrument panel right-side front cover (WP 0176).
3. Check hydraulic oil level and fill as necessary (TM 5-2420-231-10).
END OF TASK
END OF WORK PACKAGE
0261-14


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.