TM 5-2420-231-23-3
0262
CLEANING AND INSPECTION
0262
1. Clean and inspect all parts IAW Mechanical General Maintenance Instructions (WP 0369).
2. Clean and inspect all parts IAW Electrical General Maintenance Instructions (WP 0370).
END OF TASK
INSTALLATION
0262
NOTE
Install return-to-dig solenoid in position and orientation noted during removal.
1. Install return-to-dig solenoid (Figure 2, Item 4) and two bolts (Figure 2, Item 3) on return-to-dig valve
(Figure 2, Item 5).
2. Connect harness connector (Figure 2, Item 1) to return-to-dig solenoid harness (Figure 2, Item 2).
Figure 2. Loader Control Valve.
0262
END OF TASK
FOLLOW-ON TASKS
0262
Connect batteries (WP 0157).
END OF TASK
END OF WORK PACKAGE