• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
RETURN-TO-DIG SOLENOID REPLACEMENT
BACKHOE CONTROL VALVE ASSEMBLY REPLACEMENT

Tractor, Wheeled, Industrial Backhoe Loader Nsn 2420-01-532-3399
Page Navigation
  264    265    266    267    268  269  270    271    272    273    274  
img
. . .
TM 5-2420-231-23-3
0262
CLEANING AND INSPECTION
0262
1. Clean and inspect all parts IAW Mechanical General Maintenance Instructions (WP 0369).
2. Clean and inspect all parts IAW Electrical General Maintenance Instructions (WP 0370).
END OF TASK
INSTALLATION
0262
NOTE
Install return-to-dig solenoid in position and orientation noted during removal.
1. Install return-to-dig solenoid (Figure 2, Item 4) and two bolts (Figure 2, Item 3) on return-to-dig valve
(Figure 2, Item 5).
2. Connect harness connector (Figure 2, Item 1) to return-to-dig solenoid harness (Figure 2, Item 2).
Figure 2. Loader Control Valve.
0262
END OF TASK
FOLLOW-ON TASKS
0262
Connect batteries (WP 0157).
END OF TASK
END OF WORK PACKAGE
0262-2


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.