8
TM 5-2420-231-23-3
FIELD MAINTENANCE
-
LOADER LINKAGE FRAME ASSEMBLY REPLACEMENT
0280
Removal, Cleaning and Inspection, Installation
INITIAL SETUP
Materials/Parts - Continued
Tools and Special Tools
Tool Kit, General Mechanic's
0
0
Personnel Required
Pliers, Retaining Ring, Fixed Tip, Convertible,
0
Two
0
Socket, Impact, Standard, 1/2" Dr., 6 Pt, 1-3/16"
References
0
0
Wrench, Impact, Pneumatic, 1/2" Dr., 50-700 ft-lb
0
0
Equipment Conditions
Wrench, Open End, Chrome, 1-1/8" x 1-3/16"
0
Machine parked (TM 5-2420-231-10)
0
Materials/Parts
Estimated Time to Complete
Grease, Automotive and Artillery (GAA)
2.0 hr
0
0
0280-1