4
TM 5-2420-231-23-3
FIELD MAINTENANCE
-
FRONT COUNTERWEIGHT REPLACEMENT
0299
Removal, Cleaning and Inspection, Installation
INITIAL SETUP
Personnel Required
Tools and Special Tools
Tool Kit, General Mechanic's
Two
0
0
References
Socket, Impact, Standard, 1/2" Dr., 6 Pt, 1-3/16"
0
0
Wrench, Combination, Standard, 12 Pt, 30 mm
0
0
Equipment Conditions
Wrench, Impact, Pneumatic, 1/2" Dr., 50-700 ft-lb
0
Front end loader raised with safety support
0
strut engaged (TM 5-2420-231-10)
Suitable Lifting Device
0
Estimated Time to Complete
Materials/Parts
0.5 hr
0
Wood and/or Cribbing
0
0299-1