TM 5-2420-231-23-3
0358
REMOVAL CONTINUED
3. With assistance, remove four locknuts (Figure 3, Item 1), washers (Figure 3, Item 2), and blower housing
(Figure 3, Item 3) from roof (Figure 3, Item 4). Discard locknuts.
Figure 3. Blower Housing Nuts.
0358
4. Remove butyl tape (Figure 4, Item 2) from expansion valve (Figure 4, Item 1). Discard butyl tape.
Figure 4. Butyl Tape.
0358