• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 10. Installing Connecting Rod and Piston.
CONNECTING ROD REPLACEMENT

Maintenance Manual For Loader, Scoop Type, Ded 4 X 4, Articulated Frame Steer, 4.5 To 5 Cu. Yd.
Page Navigation
  848    849    850    851    852  853  854    855    856    857    858  
img
. . . .
TM 5-3805-255-14
0092
INSTALLATION CONTINUED
8. Install piston cooling jets on right side of crankcase (WP 0093).
9. Install oil suction pipe on crankcase. Use new gasket where pipe attaches to front cover. Install crankcase oil
pan with new gasket and scavenging pump manifolds (if equipped). Be sure that scavenging oil pump
manifold O-rings are in place.
10. Install cylinder heads (WP 0089).
11. Install oil suction pipe and oil pan on engine. Install and torque oil pan drain plug to 35 lb-ft (47 Nm).
12. Install engine in loader (WP 0022).
13. Check and fill all fluid levels (WP 0018).
NOTE
After installation of new piston sets or new piston rings, engine must be run-in before
operating at normal load and speed.
14. Start engine and check for leaks.
END OF TASK
END OF WORK PACKAGE
0092-12


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.