DISASSEMBLY, ASSEMBLY AND INSPECTION OF THE HUSCO MAIN VALVE
PREPARATION FOR REMOVAL OF VALVE FROM MACHINE
Thoroughly clean outside of the valve. To insure
d i s a s s e m b l i n g . Remove valve from machine and
accurate reassembly of the valve, tag all the inlet
position on mounting pads.
and outlet ports and all of the hoses and piping
connected to the pilot valve and main valve.
CARE MUST BE TAKEN TO PROTECT
Due to the weight of this valve (several hundred
ALL MACHINED SURFACES
pounds) it is advisable that preparations be made
for handling this weight when removing it from
Components in one section can be removed
the machine.
w i t h o u t removing the through bolts. Do not re-
m o v e through bolts. Do not seperate main sec-
Prepare a clean and adequate work area before
tions.