TM 5-3805-258-24-2
POWER TRAIN
DISASSEMBLY AND ASSEMBLY
DRIVE SHAFT CARRIER BEARING
REMOVE DRIVE SHAFT CARRIER
BEARING
3267-11
start by:
a) remove parking brake*
*This operation is in the VEHICLE SYSTEMS
DISASSEMBLY AND ASSEMBLY section.
1.
2.
3.
4.
5.
6.
7
8
Fasten a strap around front drive shaft (2) and
the frame of the machine as support for the
weight and to prevent damage to the drive shaft
splines.
Disconnect grease line (1) from the fitting.
Disconnect grease line (1) from fitting (3) and
remove it from the machine.
Remove the six nuts and bolts (4) that hold the
carrier bearing housings in position.
Pull the carrier bearing and housings off the
front drive shaft and remove the unit from the
machine.
Remove bolts (6) that hold housings (5) and
(7) together.
Remove housing (5) from housing (7). If neces-
sary, use two 5/8- 11 NC x 1 3/4 long bolts
through the threaded holes in housing (5) to
make a separation of the housings.
Remove the lip type seal (8) from housing (5).
5-191