TM 5-3805-262-20
11-3. LINES AND FITTINGS MAINTENANCE (CONT)
e. Control Valve Assembly to Lift Cylinder Assemblies.
This task covers removal,
c l e a n i n g , i n s p e c t i o n , a n d i n s t a l l a t i o n o f h o s e s , lines, and fittings located between
control valve assembly and lift cylinder assemblies.
TOOLS: No. 1 Common Organizational Maintenance Tool Kit
Fixed open end wrench set
Socket wrench set, 3/8 inch drive
MATERIALS/PARTS: Clean cloths (Appendix C, item 1)
Cleaning solvent P-D-680 (Appendix C, item 2)
Detergent (Appendix C, item 3)
Hydraulic oil (Appendix C, item 13)
0-rings, two (FSCM 10988 PN 218-5010)
0-rings, four (FSCM 10988 PN 218-5008)
NOTE
PRELIMINARY PROCEDURE: Engine right side panels removed (page 9-14), hy-
d r a u l i c r e s e r v o i r d r a i n e d ( p a g e 1 1 - 7 9 ),
a n d t i l t c y l i n d e r a s s e m b l i e s
t u b e s r e m o v e d ( s t e p s ( 1 ) a n d ( 3 ) , p a g e 1 1 - 4 3 , a n d s t e p s ( 1 0 ) t h r o u gh
(16), page 11-45).
11-50