TM 5-3805-262-20
INSTALLATION (SHEET 2 OF 2)
Dont use your finger to check alinement in
l o s e a f i n g e r o r s u f f e r s e v e r e i n j u r y t o
obtain medical aid immediately.
(10) Place CLAM control lever to either OPEN
f o l l o w i n g s t e p . Y o u c o u ld
d o s o . I f y o u a r e i n j u r e d,
or CLOSE position and aline cyl-
inder rod hole with hole in clam pivot hole.
(11) Turn off engine.
(12)
(13)
(14)
(15)
(16)
(17)
(18)
(19)
Start pin (5) into pivot hole at top of cylinder assembly; be sure that
hole in pin is alined with hole in cylinder .
Using hammer and 1-3/8 inches diameter rod, drive pin (5) into position.
Apply Loctite 242 (blue) to threads of capscrew (4) and locknut (3).
Install and tighten capscrew (4) and locknut (3) to 1000 to 1200 lb-ft.
L u b r i c a t e p i v o t p o i n t l u b r i c a t i o n f i t t i n g s ( r e f e r t o c u r r e n t l u b r i c a t i on
o r d e r ).
Tighten hydraulic reservoir fill cap and close and lock access door.
Start engine and operate at idle speed .
With engine operating at idle speed, open and close clam cylinder assem-
blies by placing CLAM control lever in OPEN and CLOSE positions four
times to remove air from hydraulic system.
(20) Check for hydraulic oil leakage at hose connections to clam cylinder as-
semblies. Tighten fittings as necessary.
( 2 1 ) C h e c k h y d r a u l i c r e s e r v o i r o i l l e v e l . A d d o i l a s n e c e s s a r y ( p a g e 1 1 - 7 8 ).
11-75