TM 5-3805-262-20
5-3. STARTER MAINTENANCE (CONT)
b. Circuit Breakers and Relays.
This task covers removal, cleaning, inspection,
t e s t i n g , r e p a i r a n d i n s t a l l a t i o n o f 3 0 - a m p e r e c i r c u i t b r e a k e r s , s t a r t e r r e l a y , c a b
relay and associated wiring.
TOOLS: No. 1 Common Organizational Maintenance Tool Kit
Combination box and open end wrench set
Socket wrench set, 3/8 inch drive
E l e c t r i c a l c o n n e c t o r t o o l k it
Multimeter
Torque wrench, 3/8 inch drive, 200 lb-in capacity
MATERIALS/PARTS: Clean cloths (Appendix C, item 1)
Cleaning solvent P-D-680 (Appendix C, item 2)
Detergent (Appendix C, item 3)
Insulation tape (Appendix C, item 5)
Isopropyl alcohol (Appendix C, item 15)
Electrical cleaner (Appendix C, item 19)
Electrical sealer (Appendix C, item 20)
NOTE
PRELIMINARY PROCEDURE: Engine left side panels removed (page 9-14) and
battery ground cable disconnected (page 5-148).
REMOVAL (SHEET 1 OF 4)
( 1 ) A t t o p c i r c u i t b r e a k e r ,
loosen and remove two lock nuts (l).
5-26