TM 5-3805-262-205-6. AUXlLIARY STEERlNG ELECTRICAL SYSTEM MAlNTENANCE (CONT)b. Auxiliary Steering Cables and Harness.This task covers removal, cleaning,inspection and repair, and installation of auxiliary steering pump and motor cablesand flow switch wiring harness.TOOLS: No. 1 Common Organizational Maintenance Tool KitCombination box and open end wrench setScrewdriverTorque wrench, 1/2 inch driveE l e c t r i c a l r e p a i r t o o l k itAutomotive Mechanic’s Tool KitSocket wrench set, 1/2 inch driveMATERIALS/PARTS : Clean cloths (Appendix C, item 1)Cleaning solvent P-D-680 (Appendix C, item 2)Detergent (Appendix C, item 3)Insulation tape (Appendix C, item 5)Isopropyl alcohol (Appendix C, item 15)Electrical cleaner (Appendix C, item 19)Electrical sealer (Appendix C, item 20)NOTEPRELIMINARY PROCEDURE: Battery ground cable disconnected (page 5-148)and engine left front side panel removed (page 9-14).REMOVAL (SHEET 1 OF 2)(1)(2)( 3)(4)(5)(6)At starter solenoid BAT terminal, loosen and remove nut (1) and lockwasher (2) and disconnect three cables.At auxiliary steering pump and motor, at bottom relay terminal, loosenand remove nut (3) and lock washer (4) and remove cable (5).At bottom motor terminal, loosen and remove nut (6) and lock washer (7)and disconnect cable (8).At motor mounting bracket, at end of cable (8), loosen and remove one nut(9), lock washer (10), and capscrew (11). Then remove cable (8) froml o a d e r.At motor relay, at two center terminals, locate and tag white-black wireand wire (16). Then loosen and remove two nuts (12) and lock washers (13)and disconnect wires.At base of motor relay, at end of wire (16), loosen and remove screw (14)and lock washer (15). Remove wire (16) from loader.5-84
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business