TM 5-3805-262-20
6-1. TRANSMISSION MAINTENANCE (CONT)
b. Control Valve Linkage.
This task covers removal, cleaning, inspection, in-
stallation, and adjustment of control valve linkage.
TOOLS: Automotive Mechanics Tool Kit
Diagonal cutting pliers
M a c h i n i s t ' s s t e e l r u le
No. 1 Common Organizational Maintenance Tool Kit
Socket wrench set, 1/4 inch drive
Socket wrench set, 3/8 inch drive
Fixed open end wrench set
Screwdriver
L u b r i c a t i n g k i t
Socket head screw key set
R e t a i n i n g r i n g p l i e rs
Sleeve, 1-1/4 inches diameter
MATERIALS/PARTS: Clean cloths (Appendix C, item 1)
Cleaning solvent P-D-680 (Appendix C, item 2)
D i e s e l f u e l ( r e f e r t o c u r r e n t l u b r i c a t i o n o r d e r )
PERSONNEL REQUIRED: Two Construction Equipment Mechanics M0S 62B
REFERENCES: LO 5-3805-262-12
NOTE
PRELIMINARY PROCEDURE: Engine right side panels removed (page 9-14).
6-10