TM 5-3805-262-20
6-1. TRANSMISSION MAINTENANCE (CONT)
b. Control Valve Linkage (cont).
INSPECTION
(1)
( 2)
(3)
( 4)
(5)
(6)
(7)
NOTE
Replace all parts determined to be defective in following steps .
Check cable assembly (4) for smooth movement. Check that cable slides
smoothly in cable housing.
Inspect cable assembly (4) for kinks and broken wires strands. Check that
covering is not cracked, split, cut, or broken. Check that four seals (6)
are not cut,
cracked, or split. Replace seals if any of these conditions
are seen.
Rotate bearings (36 and 68) and check that movement is smooth and not
rough or tight. Check that bearings are not chipped.
Inspect spring (12) for cracks or signs of permanent set.
Inspect bushing (19) for scores or nicks. Check seal (18) for damage. If
seal or bushing requires replacement, use a 1-1/4 inches diameter sleeve
and press from block assembly (17). To reinstall, press bushing and seal
into block assembly using 1-1/4 inches diameter sleeve. Refer to illus-
tration below for positioning of bushing and seal .
I n s p e c t r e t a i n i ng
Inspect remaining
damaged threads.
INSTALLATION (SHEET 1 OF 4)
( 1 ) I n s t a l l r e t a i n i n g
ring (69) for deformation, breaks or cracks.
parts for cracks, bent condition, and crossed or
ring (69) and position two bearings (68) on bellcrank
(70) shaft. Position bellcrank (70) with bearings (68) installed on pivot
plate (64). Secure bearings using four capscrews (67), lock washers (66),
and nuts (65).
(2) Position assembled bellcrank (70) and pivot plate (64) on side of trans-
mission and secure bellcrank using two lock washers (63) and capscrews
( 6 2 ).
6-14