TM 5-3805-262-34
3-15. AUXILIARY STEERING PUMP AND MOTOR MAINTENANCE (CONT)
d. Auxiliary Steering Motor.
This task covers disassembly, cleaning, inspection,
reassembly and testing of auxiliary steering motor.
TOOLS: No. 1 Common Organizational Maintenance Tool Kit
Hand hammer, 16 ounces
Combination box and open end wrench set
Retaining ring pliers
Safety glasses
Multimeter
Screwdriver
Socket wrench set, 3/8 inch drive
Indicating dial scale, zero to 50 pounds
Automotive Mechanics Tool Kit
Drive pin punch, 1/8 inch point
Growler
Dial indicator
Hydraulic press
Micrometer, zero to 5 inches
Rubber mallet
Sleeve or rod, 1-3/8 inches diameter
Sleeve or rod, 3/8 inch diameter
Sleeve, 3/4 inch inside diameter
Sleeve, 1/2 inch inside diameter
Bearing collar
Machinists lathe
Starting and charging system tester
Tachometer
12 Volt battery
Toggle switch
MATERIALS/PARTS: Clean cloths (Appendix C, item 1)
Cleaning solvent P-D-680 (Appendix C, item 2)
Abrasive cloth (Appendix C, item 8)
Paint (Appendix C, item 22)
NOTE
PRELIMINARY PROCEDURE: Auxiliary steering pump and motor separated (page
3-532).
DISASSEMBLY (SHEET 1 OF 5)
(1) Remove one nut (1) and lock washer (2).
(2) Remove two screws (3) and lock washers (4).
3-540