TM 5-3805-262-343-17. FLOW CONTROL VALVE MAINTENANCE (CONT)INSTALLATIONa.Just behind hydraulic reservoir, position flow control valve (4) in loader.b.Secure flow control valve (4) using two capscrews (1), lock washers (3), andnuts (2).c.Reconnect fittings and hoses to flow control valve (refer to TM5-3805-262-20).d.Fill hydraulic reservoir with oil (refer to TM 5-3805-262-20).e.Tighten hydraulic reservoir fill cap.f.Start engine and operate at idle speed.Before performing following step, warn personnel to stay away from sidesof loader between front and rear chassis. Failure to do so will causedeath or serious injury to those personnel due to chassis pivoting andcrushing them.If personnel are injured, obtain medical assistanceimmediately.g.Turn steering wheel through several complete turns to bleed any air fromhydraulic system.h.Turn off engine and check for oil leaks. Tighten fittings as necessary.LEGEND1. Capscrews (2)2. Nuts (2)3. Lock washers (2)4. Flow control valve3-570
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business