TM 5-3805-262-343-17. FLOW CONTROL VALVE MAINTENANCEThis task covers removal, disassembly, cleaning, inspection, reassembly, installa-tion, and testing of flow control valve.TOOLS: No. 1 Common Organizational Maintenance Tool KitSocket wrench set, 3/8 inch driveRetaining ring pliersFixed open end wrench setSafety glassesPressure gage, zero to 3000 psiMATERIALS/PARTS: Clean cloths (Appendix C, item 1)Cleaning solvent P-D-680 (Appendix C, item 2)O-ring (FSCM 10988 PN 218-5002)REFERENCE: TM 5-3805-262-20NOTEPRELIMINARY PROCEDURE: Loader turned to extreme right and hoses discon-nected from control valve (refer to TM 5-3805-262-20).REMOVALLEGEND1. Capscrews (2)2. Nuts (2)3. Lock washers (2)4. Flow control valvea.Just behind hydraulic reservoir, support flow control valve (4) and removetwo capscrews (1), nuts (2), and lock washers (3).b.Remove flow control valve (4) from loader.3-566
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business