TM 5-3805-290-23-2
CONTROL SWITCHES AND PANELS REPLACEMENT - CONTINUED
0049 00
RIGHT-SIDE CONTROL CONSOLE INSTALLATION
WARN I N G
Ensure battery disconnect switch is in OFF position before performing this task. Failure to follow this
warning may result in injury to personnel or damage to equipment.
N OT E
The following steps are for machines equipped with an arctic cold weather starting kit.
1.
Install arctic heater switch (30) in right-side control console cover (23).
2.
Install collar (33) on arctic heater switch (30).
3.
Install ten toggle switches (32) in panel cover (23).
4.
Connect ten wiring harnesses (31) to backs of toggle switches (32).
5.
Connect two wiring harness connectors (29) to arctic heater switch (30).
6.
Install right-side control console cover (23) and four screws (27) on right-side control console housing (28).
7.
Install new lockwasher (25) and nut (24) on temperature control switch (26).
8.
Install temperature control knob (22) on right-side
control console cover (23) and tighten setscrew (21).
427-B0886
END OF WORK PACKAGE
0049 00-7/(0049 00-8 Blank)