• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
INSTRUMENT CLUSTER REMOVAL
ACTION ALARM INSTALLATION

Manual 2 Loader, Light, Scoop: 2.5 Cubic Yard Multipurpose (Mp) Clamshell Bucket, Diesel Engine Driven (Ded), 4-Wheel Drive Model 924G
Page Navigation
  167    168    169    170    171  172  173    174    175    176    177  
img
TM 5-3805-290-23-2
INSTRUMENT CLUSTER AND TURNLAMP SWITCH REPLACEMENT - CONTINUED
0051 00
INSTRUMENT CLUSTER INSTALLATION
1.
Support instrument cluster (2) and position turnlamp switch (7) in rear of instrument cluster.
2.
Install three new lockwashers (11) and nuts (10) on turnlamp switch (7).
3.
Connect wiring harness (9) to rear of instrument cluster (2) and tighten screw (8).
4.
Position instrument cluster (2) on panel (3).
5.
Install seven screws (1) in instrument cluster (2).
6.
Install turnlamp switch handle (6), screw (5), and cover (4) on turnlamp switch (7).
7.
Verify correct operation of instrument cluster and turnlamps (TM 5-3805-290-10).
TURNLAMP SWITCH REMOVAL
0051 00
1.
Disconnect turnlamp switch (7) from instrument cluster by performing steps 1 thru 4, 6, and 7 of Instrument Cluster
Removal in this work package.
N OT E
Tag all wires prior to removal to ensure correct installation.
2.
Disconnect wiring harness (9) from turnlamp switch (7).
TURNLAMP SWITCH INSTALLATION
1.
Connect wiring harness (9) to turnlamp switch (7).
2.
Connect turnlamp switch to instrument cluster by performing steps 1, 2, and 4 thru 6 of Instrument Cluster Installation
in this work package.
0051 00
ACTION ALARM REMOVAL
1.
Remove instrument cluster. Refer to Instrument
Cluster Removal in this work package.
2.
Disconnect wire (12).
3.
Remove nut (13) and washer (14) from action alarm
(15).
4.
Remove action alarm (15) from duct (16).
4 2 7 -B2 1 1 6
427-B2116
0051 00-3


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.